Software-Engineering
October 5, 2023NVS PGT CS 2019 Part-B
October 5, 2023Software-Engineering
| Question 30 |
Consider a software program that is artificially seeded with 100 faults. While testing this program, 159 faults are detected, out of which 75 faults are from those artificially seeded faults. Assuming that both are and seeded faults are of same nature and have same distribution, the estimated number of undetected real fault is _____ .
| 28 | |
| 176 | |
| 177 | |
| 178 |
Question 30 Explanation:
Note: Out of Syllabus.
Correct Answer: A
Question 30 Explanation:
Note: Out of Syllabus.
