Question 4225 – 2008 December UGC NET Paper 1
December 28, 2023
GATE 2008-IT
December 29, 2023
Question 4225 – 2008 December UGC NET Paper 1
December 28, 2023
GATE 2008-IT
December 29, 2023

Question 8917 – Pipelining

Consider a 5-segment pipeline with a clock cycle time 20ns in each sub operation. Find out the approximate speed-up ratio between pipelined and non-pipelined system to execute 100 instructions. (if an average, every five cycles, a bubble due to data hazard has to be introduced in the pipeline)

Correct Answer: B

A
5
B
4.03
C
4.81
D
4.17

Leave a Reply

Your email address will not be published. Required fields are marked *