COCOMO-Model

Question 1

A company needs to develop digital signal processing software for one of its newest inventions. The software is expected to have 40000 lines of code. The company needs to determine the effort in person-months needed to develop this software using the basic COCOMO model. The multiplicative factor for this model is given as 2.8 for the software development on embedded systems, while the exponentiation factor is given as 1.20. What is the estimated effort in person-months?

A
234.25
B
932.50
C
287.80
D
122.40
Question 1 Explanation: 
Note: Out of syllabus.
Question 2

Consider the basic COCOMO model where E is the effort applied in person-months, D is the development time in chronological months, KLOC is the estimated number of delivered lines of code (in thousands) and ab, bb, cb, db have their usual meanings. The basic COCOMO equations are of the form

A
E = a b(KLOC)exp (b b, D = c b(E)exp (d b)
B
E = a b(KLOC)exp (b b, D = c b(E)exp (d b)
C
E = a bexp⁡(b b), D = c b(KLOC)exp (d b)
D
E = a bexp(D b), D = c b(KLOC)exp (b b)
Question 2 Explanation: 
Basic COCOMO model takes the form
Effort applied (E) = ab(KLOC)bb
Development time (D) = cb(E)db
Question 3
Estimation of software development effort for organic software in basic COCOMO is
A
E = 2.0(KLOC)1.05 Per Month
B
E = 3.4(KLOC)1.06 Per Month
C
E = 2.4(KLOC)1.05 Per Month
D
E = 2.4(KLOC)1.07 Per Month
Question 3 Explanation: 
The basic COCOMO equations take the form
1. Effort Applied (E) = ab(KLOC)bb [ man-months ]
2. Development Time (D) = cb(Effort Applied)db [months]
3. People required (P) = Effort Applied / Development Time [count]

where, KLOC is the estimated number of delivered lines (expressed in thousands ) of code for project. The constants ab, bb, cb and db are given in the following table (note: the values listed below are from the original analysis, with a modern reanalysis producing different values)

Question 4
A company needs to develop digital signal processing software for one of its newest inventions. The software is expected to have 20000 lines of code. The company needs to determine the effort in person-months needed to develop this software using the basic COCOMO model. The multiplicative factor for this model is given as 2.2 for the software development on embedded systems, while the exponentiation factor is given as 1.50. What is the estimated effort in person-months?
A
196.77
B
206.56
C
199.56
D
210.68
Question 4 Explanation: 
Constructive Cost Model (COCOMO) formula for effort applied is
Effort Applied (E) = ab(KLOC)bb [ person-months ]
= 2.2 x(20)1.50
= 2.2 x 89.44
= 196.77
Question 5
The cyclomatic complexity of each of the modules A and B shown below is 10. what is the cyclomatic complexity of the sequential integration shown on the right hand side?
A
19
B
21
C
20
D
10
Question 5 Explanation: 
Cyclomatic complexity is a software metric used to indicate the complexity of a program.
It is a quantitative measure of the number of linearly independent paths through a program's source code.
Cyclomatic Complexity of module = Number of decision points of program + 1
Number of decision points in module-A = 10 - 1 = 9
Number of decision points in module-B = 10 - 1 = 9
Cyclomatic Complexity of the integration(both A and B) = Number of decision points + 1
= (9 + 9) + 1
= 19
There are 5 questions to complete.

Access quiz wise question and answers by becoming as a solutions adda PRO SUBSCRIBER with Ad-Free content

Register Now

If you have registered and made your payment please contact solutionsadda.in@gmail.com to get access