...
August 28, 2024

Software-Engineering

Question 344 Which of the following is not a deliverable of the structured system analysis? A Data flow diagram B Prototype model C Entity Relationship diagram […]
August 28, 2024

Software-Engineering

Question 345 A program p calls two subprograms P1 and P2. P1 can fail 50% time and P2 can fail 40% times. The program P can […]
August 28, 2024

Software-quality

Question 8 If in a software project the number of user input, user output, enquiries, files and external interfaces are (15, 50, 24, 12, 8), respectively, […]
August 28, 2024

Software-Engineering

Question 374 The Function Points(FP) calculated for software projects are often used to obtain an estimate of Lines of code(LOC) required for that project. Which of […]